One ladder. Three entry points.
Every number below is one Andrew says on the phone every week. The call tells you where on the ladder you are; the site visit turns a range into a quote.
Free
The 15-minute call. A range, a path, and the right visit — or a referral out.
Free
Rough estimate by email for buyers and sellers on a deadline, from photos and the inspection report.
Free
No-charge site visit only when LBWC did the engineering or the engineer’s visit and the question is just the construction quote — after a call. Someone else’s engineering means the normal $435 visit.
Photos → price
Small jobs. Upload photos with your call request; you’ll usually get a price on the call. Sometimes a $300 look-see first. Typically $1,800–8,000.
$435
Crew site visit — our construction planning team, LiDAR scan attic to basement, a drafted plan set you keep, written quote in 1–2 days. Tue/Thu. Refundable with 24 h notice.
$595
Engineer’s site visit — a licensed engineer inspects and scans; stamped letter included if no work is needed. Visit in 1–3 business days, letter 2–3 after.
$635
Combined visit — the planning team and the engineer together, for garages, Spancrete and ambiguous repairs.
$695
First design area — permit-ready beam/header design with drafting; $395 for each additional area. $600 for a full-house LiDAR model on its own.
$1,400–2,200
Engineering + drafting folded into a crew project when the project needs it.
$7,500–8,500 / day
The structural crew. One-day projects $8,500–9,500; two days about $15,000–16,000; three days $20,000+; additional days about $6,000. Minimum crew project [MINIMUM — confirm; the old site says $4,800].
[confirm]
Basement and garage slabs. New this fall. Typical basement replacement at the same level [PRICE RANGE]; dig-down basements quoted from the design.
Money mechanics
- $1,000–2,000 deposit at signing
- Balance at substantial completion
- You hold $1,000 until the city signs off
- 4% of the project buys 0% financing for a year
Why phone numbers run high
Andrew gives ranges on the call that are meant to be on the high side. The visit exists to tighten them.
What moves the price
- Flush beam (hidden) vs. drop beam with a column
- Footing work below the new load
- Whether you do the demo and finishes
- One crew day vs. two
Next step
Every path starts with a 15-minute call with Andrew.