Dormers, attic suites, basement walkouts, widening a garage door, a future second story

Will the structure carry what you’re planning?

The projects where the drawing comes first. A LiDAR scan of the house you actually have beats the blueprints the city may not even keep.

  • scan + discovery · $595–635
  • first design · $695
  • each added area · $395

How Andrew reads it on the call

Design it once, bid it to anyone.

For a shed dormer, an attic converted to a suite, a walkout cut into a basement wall, or a garage door opening widened with a second story in mind, the engineering package is the product.

Andrew will tell you on the call whether the whole plan needs review or just the structural pieces.

Photos help more than words. Upload two wide shots and one close-up with your call request — Andrew looks at them before he dials.

In your words

Adding a shed dormer to one of the upstairs rooms. It’s an old home. Looking for engineering to possibly do it myself.

Cut a walkout from the basement onto a flat ground-level patio where a big deck used to sit.

Then, one of 3 outcomes

Scan, draft, design · Construction from the plan set · Engineering only

Engineering package

Scan, draft, design

A discovery visit with the engineer and drafter, iterative drawings with you.

  • $595–635 visit and scan
  • $695 first design area, $395 each additional

Typically $1,400–2,800 all in

We build the structure

Construction from the plan set

Framing, beams, headers, footings, the walkout cut, the widened opening.

  • Quoted from the design, not before
  • Crew work runs $7,500–8,500 a day

By the plan8,500–9,500 · electrical and drywall put-back adds about $5,000–8,000

You or your builder

Engineering only

Your GC frames it; you do the stairs yourself.

  • Same engineering package
  • Field review $500 per visit

Engineering onlyday and a half to two crew days

We carry

  • LiDAR scan and as-built drawings
  • Structural design and stamping
  • Permit-ready plan set you keep

You carry

  • A sketch or a marked-up photo of what you want
  • Architectural design beyond structure
  • Grading, excavation, masonry and finishes

Next step

Every path starts with a 15-minute call with Andrew.

Google Meet or phone. You’ll get a real range and the right next step — or an honest “that’s not us, call this person.” Timing is approximate.

Book a 15-minute call
Not sure? Find my path

related

Other situations people bring us

Usually $8,500–16,000 · or a $595 letter if it isn’t bearing

Usually $6,000–25,000 · one to three crew days · foundations often see the engineer first

Usually $1,800–9,500 · often a one-day job · frequently discovered mid-project

Usually $8,500–30,000 · the engineer often comes along on the visit